Graduate Engineer
After I conducted all the PIT, I began working on collating the Quality Assurance (QA) documentation for our upcoming areas that are about to be piled. This involves creating a spreadsheet with information such as the pile ID, pile diameter, drill depth & concrete volume to name a few metrics.